Ionizationx: a clean environment is a human right!
Projects by members => Projects by members => J. Miller => Topic started by: jim miller on March 08, 2021, 17:21:26 pm
-
Multi-tier EPG Build Listing 6TMaggasEPG mod 5 listing in progress
COPPER AND PLUMBING
Quantity Description Part Designator Materials
6 Spiral Tier ST 300 cm tubing per tier
6 Inter-tier Tube IT 22 cm each connecter
14 45 Degree fittings ITF 2 for each IT
1 Recycling tube RT 1
1 Top Feed tube TFT 22 cm
1 90 Degree fitting TFTF 1 * Recycling tube is greater diameter fitting harder to locate if 45 degree option
4 Linear Pump fittings LMPF 4 to connect linear mag pumps to RT
2 Taper Fittings TPF 2 for vacuum evacuation and gas/slurry fill
2 Magnetic pumps LMP for gas/slurry movement
1 vacuum pump
Wire 22 ga AWG IWW inductor windings
28 awg ACW alignment coils
qs 0 awg
4 awg
10-12 awg Romex(r) 3 conductor/w ground
HARDWARE
1 Plywood base for 7T gega Perspex for the 6T model use the Perspex 40 x 40 cm, for plywood larger to accommodate EEW ass'y
8 power connectors
GAS
Quantity of gas required is pressure dependent, evacuate spiral core first open fill valve FV2 for gas introduction
for ferrofluid models measure out calculated fill volume for device and introduce from bottom slowly use2 inline
fluid traps before vacuum pump
ELECTRON EXTRACTION WELL (EEW)
6 Porcelain Light Bulb fixtures
6 Square metal outlet boxes
1 stepping switch to increase load on warm up
6 Incandescent Bulbs 100 or150 watts depends on amount of energy to be dissipated in electron extraction well (EEW)
do not use LED bulbs , they are too energy efficient!
qs Mounting hardware screws/bolts